Shunt Reactor Isolation

Product category:
shunt reactor
Product code:
P-081
Model:
BKS-114/10

Specification options

Surprise on inquiry

Product highlights

  • Flexible Configuration
  • On-site installation convenience
  • Convenient operation and maintenance
  • High Reliability

Model

BKS-114/10

Main Product Parameters

BrandSpecialtyNumber of PhasesThree-Phase
Application ScopeContact Customer ServiceProduct TypeThree-Phase
Product SeriesReactorPackaging parameter 1Specification: BKS-72/10; Weight (g): 100000
Packaging parameter 2Specification: BKS-114/10; Weight (g): 100000Packaging parameter 3Specification: BKS-144/10; Weight (g): 100000
Packaging parameter 4Specification: BKS-300/10; Weight (g): 100000Packaging parameter 5Specification: BKS-600/10; Weight (g): 100000
Packaging parameter 6Specification: BKS-1200/10; Weight (g): 100000Packaging parameter 7Specification: BKS-3000/10; Weight (g): 100000
Packaging parameter 8Specification: BKS-8000/10; Weight (g): 100000Packaging parameter 9Specification: BKS-10000/10; Weight (g): 100000
Packaging parameter 10Specification: BKS-5000/35; Weight (g): 100000Packaging parameter 11Specification: BKS-8000/35; Weight (g): 100000
Packaging parameter 12Specification: BKS-10000/35; Weight (g): 100000Packaging parameter 13Specification: BKS-20000/35; Weight (g): 100000

Product details

Application Scenarios: Variable-frequency drive loads in Indonesian factories, data centers, commercial buildings, photovoltaic grid-connection points, and EV charging stations. Functional Applications: Reactive power compensation, harmonic mitigation, and voltage support.

Product Configuration: P-112; Oil-immersed three-phase shunt reactor model BKL-10000/35. Indonesia Adaptation: Designed for Indonesian grid fluctuations and nonlinear loads. Conduct on-site measurements first to determine optimal APF/SVG/reactor/filter capacity; verify high-temperature derating and cabinet ventilation requirements.

Requirement confirmation

Application, rating, quantity and drawings are checked first.

Factory matching

Supplier capacity, certificates and production slot are reviewed.

Order transaction

Confirm commercial terms, sign the commercial contract, and confirm the related document checklist.

Shipment control

Packing photos, inspection records and delivery status are tracked.