XJ3 Series Phase Failure and Phase Sequence Protection Relay

Product category:
Protection Relay
Product code:
P-527
Model:
XJ3

Function & Use (Application Scenarios)

Relays, protective relays are mainly applicable for overvoltage, undervoltage, phase loss protection in three-phase AC circuits, and for phase sequence protection in non-reversible drive equipment. They have the characteristics of reliable performance, wide applicability, and convenient use.

Surprise on inquiry

Product highlights

  • Engineering Application Compatibility
  • Stable and reliable operation
  • Easy system integration

Model

XJ3

Main Product Parameters

CategoryRelay Protection and Automation DevicesSecondary CategoryProtection Relay

Product details

Function and Usage

The XJ3 series phase failure and phase sequence protection relay is used in three-phase AC circuits for overvoltage, undervoltage, phase failure protection, and for phase sequence protection in non-reversible drive equipment. It has the characteristics of reliable performance, wide applicability, and convenient use.

Detailed Parameters

Parameter CategoryParameter ItemParameter Value
Protection FunctionXJ3-G XJ3-G1 XJ3-D
Phase Failure Phase Sequence
Three-phase voltage imbalance ≥8%-13%
Overvoltage Protection (AC)- 380V-460V 1.5s-4s (adjustable)
Undervoltage Protection (AC)- 300V-380V 2s-9s (adjustable)
Rated Control Circuit Power Supply VoltageAC380V, 50Hz AC 380V 50Hz
Number of Contacts1 Normally Open 1 Normally Closed 1 Set of Transfer
Contact CapacityUe/le: AC-15 240V/0.75A, 415V/0.47A Ith:5A Ue/le: 415V/0.47A Ith:3A
Phase Failure and Phase Sequence ProtectionAction Time≤2s ≤1s
Electrical Life1×10⁵
Mechanical Life1×10⁶
Environmental Temperature-5℃~+40℃
Installation MethodDevice Type or Rail Type 35mm Rail Installation or Hole Punch Installation
Note: In the application circuit example diagram, the protection relay only takes effect when a phase failure occurs between the terminal 1, 2, 3 and the three-phase power supply A, B, C.

Requirement confirmation

Application, rating, quantity and drawings are checked first.

Factory matching

Supplier capacity, certificates and production slot are reviewed.

Order transaction

Confirm commercial terms, sign the commercial contract, and confirm the related document checklist.

Shipment control

Packing photos, inspection records and delivery status are tracked.