Silicon Molybdenum Rod Heating Equipment Transformer / Three-Phase High-Current Transformer: 380 V / 36 V / 42 V / 50 V

Product category:
Submerged arc furnace transformer
Product code:
P-034
Model:
Inquiry

Function & Use (Application Scenarios)

Functional Purpose: This transformer performs voltage transformation, galvanic isolation, and load power supply; the substation and distribution system interface is verified against PLN grid connection point requirements and load-side specifications of 230/400 V, 50 Hz.

Surprise on inquiry

Product highlights

  • On-Site Installation Convenience
  • Improved Operational Safety and Stability
  • Convenient operation and maintenance
  • Humid-Tropical Thermal Management Solution

Model

Inquiry

Main Product Parameters

BrandTianjin BrandSeriesTransformer
SpecificationGSG-250kva 380v/50vCountry/Region of OriginJiading District, Shanghai
Custom Fabrication AvailableCustomizable per customer requirementsRated Voltage380 V / 50 V configuration customizable per customer requirements
Rated Capacity250DimensionsDesign-capable
Product CertificationCE CertificationPrimary Sales RegionsDomestic (China)
TransformerIsolation TransformerWeight650000

Product details

Application Scenarios: Silicon molybdenum rod heating equipment transformer / three-phase high-current transformer: 380 V / 36 V / 42 V / 50 V is deployed for power supply to industrial parks, commercial buildings, mining sites, photovoltaic/wind power step-up substations, and remote islands in Indonesia.

Product Configuration: P-044; Model: 380 V; Ratings: 200 kVA, 380 V, 400 V, 36 V, 12 V; Frequencies: 50 Hz, 60 Hz. Indonesia-Specific Adaptation: For humid tropical environments, attention must be paid to insulation class, condensation resistance, and thermal dissipation; for coastal projects, salt fog corrosion protection must be verified; for remote island deployments, spare parts provisioning and lifting/transportation conditions must be pre-planned; for mining or underground applications, explosion-proof and standard models must never be intermixed, and certification scope must be individually validated per project requirement.

Requirement confirmation

Application, rating, quantity and drawings are checked first.

Factory matching

Supplier capacity, certificates and production slot are reviewed.

Order transaction

Confirm commercial terms, sign the commercial contract, and confirm the related document checklist.

Shipment control

Packing photos, inspection records and delivery status are tracked.