NJR2-G Series Soft Starter Control Cabinet

Product category:
soft starter
Product code:
P-721
Model:
NJR2-G

Function & Use (Application Scenarios)

Industrial automation and soft starter control cabinet products are mainly applicable to the NJR2-G series soft starter control cabinets, which are controlled by soft starters and assembled with corresponding contactors to realize the soft start and soft stop functions of three-phase AC squirrel cage induction motors, while also having

Surprise on inquiry

Product highlights

  • Three-phase imbalance management
  • Overload protection reliable
  • Control response is stable
  • Engineering Application Compatibility
  • Stable and reliable operation

Model

NJR2-G

Main Product Parameters

CategoryInverters and Soft StartersSecondary CategorySoft starter

Product details

Function and Usage

The NJR2-G series soft starter control cabinet is composed of a soft starter as the main control unit and corresponding contactors, realizing the soft start and soft stop functions of three-phase AC squirrel cage induction motors. It also has multiple protection functions such as overload, overcurrent, phase loss, three-phase imbalance, overvoltage, and undervoltage. It is widely applied in metallurgy, petroleum, chemical industry, machinery, water supply, municipal, cement, and other industries, and is an ideal replacement for traditional Y/△ starting and autotransformer voltage reduction starting.

Detailed Parameters

Parameter CategoryParameter ItemParameter Value
3.1 Main Parameters and Technical PerformancePower Supply Voltage380V±57V; 50Hz±1Hz/60Hz±1.2Hz
Starting Current0.5-5 times the starting current limit
Soft Start Time0s-60s
Soft Start Base Voltage30%Ue-70%Ue
Impulse Starting Time0.1s
Environmental RequirementsEnvironmental temperature between -10℃~40℃; for every 1℃ increase above 40℃, the load must be reduced by 2%; relative humidity not exceeding 95%. No condensation, no flammable or explosive gases, no conductive dust, good ventilation. For altitudes above 1000 meters, the capacity should be reduced accordingly. For every 100 meters increase above 1000 meters, the current is reduced by 0.5%

Requirement confirmation

Application, rating, quantity and drawings are checked first.

Factory matching

Supplier capacity, certificates and production slot are reviewed.

Order transaction

Confirm commercial terms, sign the commercial contract, and confirm the related document checklist.

Shipment control

Packing photos, inspection records and delivery status are tracked.