Aluminum-Clad Steel Stranded Conductor, State Grid Engineering, Wind Power Generation, Straight Type JLB20A-100/40A

Product category:
Overhead wire/bare conductor
Product code:
P-175
Model:
JLB20A-150

Specification options

Surprise on inquiry

Product highlights

  • Reliable Quality
  • Supports new energy engineering integration
  • Moisture-Proof Maritime Packaging

Model

JLB20A-150

Main Product Parameters

BrandWeiquanApplicable StandardsGB Standard (Chinese National Standard)
Applicable ScopeOverhead line stringingProduct CertificationCCC
Warranty1 yearPackaging parameter 1Specification: JLB20A-35; Weight (g): 500
Packaging parameter 2Specification: JLB20A-50; Weight (g): 500Packaging parameter 3Specification: JLB20A-70; Weight (g): 500
Packaging parameter 4Specification: JLB20A-80; Weight (g): 500Packaging parameter 5Specification: JLB20A-100; Weight (g): 500
Packaging parameter 6Specification: JLB20A-120; Weight (g): 500Packaging parameter 7Specification: JLB20A-150; Weight (g): 500
Packaging parameter 8Specification: JLB40A-35; Weight (g): 500Packaging parameter 9Specification: JLB40A-50; Weight (g): 500
Packaging parameter 10Specification: JLB40A-70; Weight (g): 500Packaging parameter 11Specification: JLB40A-80; Weight (g): 500
Packaging parameter 12Specification: JLB40A-100; Weight (g): 500Packaging parameter 13Specification: JLB40A-120; Weight (g): 500
Packaging parameter 14Specification: JLB40A-150; Weight (g): 500

Product details

Application Scenarios: Distribution networks for Indonesian factories, buildings, photovoltaic power plants, mines, ports, and islands. Function: Power transmission.

Product Configuration: P-236; Model JLB20A-100; 40A. Indonesian Adaptation: Jacket, armor, waterproofing, and corrosion protection must be individually verified for high-temperature, humid, ultraviolet, salt fog, and underground installation environments; moisture-proof reel packaging is required for long-distance maritime transport.

Requirement confirmation

Application, rating, quantity and drawings are checked first.

Factory matching

Supplier capacity, certificates and production slot are reviewed.

Order transaction

Confirm commercial terms, sign the commercial contract, and confirm the related document checklist.

Shipment control

Packing photos, inspection records and delivery status are tracked.