UL-Certified Three-Phase Transformer, Step-Down, CU-Rated per U.S. Standards, Isolation Type, 480 V / 380 V / 220 V

Product category:
Special transformer
Product code:
P-033
Model:
UL-Certified Transformer

Function & Use (Application Scenarios)

Functional Purpose: Voltage transformation, electrical isolation, and load power supply; configured to interface with PLN grid connection points and load-side requirements of 230/400 V, 50 Hz.

Surprise on inquiry

Product highlights

  • On-site installation convenience
  • Enhanced operational safety and stability
  • Convenient operation and maintenance
  • Humid-Tropical Thermal Management Solution

Model

UL-Certified Transformer

Main Product Parameters

Voltage Ratio480/380Supply Phase CountThree-Phase
Rated Power1kva-1000kvaMoisture-Proof MethodOpen-Type
Cooling MethodSelf-CooledCooling TypeDry-Type
Frequency CharacteristicsLow-FrequencyBrandZJCBIN
Winding ConfigurationThree-WindingCore ConfigurationCore-Type
Core ShapeEI-ShapeExternal Structural DesignVertical Mounting
Efficiency (η)95%ModelUL-Certified Transformer
Primary Downstream PlatformseBay, Amazon, Wish, AliExpress, Independent E-Commerce Site, LAZADA, OthersPrimary Sales RegionsAfrica, Europe, South America, Southeast Asia, North America, Northeast Asia, Middle East, Others
Own Brand Available for LicensingYes1Export Transformer
3UL-Certified Transformer, 480 V to 380 V2U.S. UL-Certified Transformer
Packaging parameter 1Specification: UL-Certified Transformer; Length (cm): 1; Width (cm): 1; Height (cm): 1; Volume: 1; Weight (g): 1

Product details

Application Scenarios: Power supply for industrial parks, commercial buildings, mines, photovoltaic/wind power step-up substations, and remote islands in Indonesia.

Product Configuration: P-043; UL-Certified Transformer Model; 380 V. Indonesia Adaptation: For humid and tropical environments, pay attention to insulation class, condensation resistance, and thermal dissipation; for coastal projects, verify salt fog corrosion protection; for remote island projects, reserve spare parts and ensure lifting/transportation provisions.

Requirement confirmation

Application, rating, quantity and drawings are checked first.

Factory matching

Supplier capacity, certificates and production slot are reviewed.

Order transaction

Confirm commercial terms, sign the commercial contract, and confirm the related document checklist.

Shipment control

Packing photos, inspection records and delivery status are tracked.